Multidisdiplinary and multiscale geophysical and geochemical imaging of la palma island geothermal system. Data Acronym: GEOTHERPAL-CHEM Reference: TED2021-131882B-C44 Partners: : Universidad Complutense de Madrid (UCM), Universidad de Barcelona (UB) y Instituto Tecnológico y de Energías Renovables (ITER) Duration: 01/12/2022 to 31/05/2025 Budget: 74.750,00 € Co-Financing: The State Research Agency (AEI), through the call for proposals for Strategic Projects Aimed at the Ecological and Digital Transitions, under the State Plan for Scientific, Technical and Innovation Research (2021–2023), as part of the Recovery, Transformation and Resilience Plan, for the year 2021. Project overview Gas geochemistry is one of the key tools in…
Author: admin
Diseño e instalación de una plataforma abierta de telecomunicaciones por satélite con centro de control en Tenerife Canary Islands Digital Innovation Hub Data Acronym: CIDIHUB 2.0 Reference: 101256809 Partners: Innovalia Asociación de Empresas Tecnológicas (INNOVALIA), Instituto Tecnológico de Canarias (ITC), Instituto Tecnológico y de Energías Renovables (ITER), Universidad Fernando Pessoa Canarias (UFPC), TECH education, Plataforma Oceánica de Canarias (PLOCAN), Asociación Mentorday, Gestión y Planeamiento Territorial y Medioambiental (GESPLAN), Clúster Aeroespacial de Canarias (CAAC), IncoLAB Clúster, Promotur Turismo Canarias and Asociación para el desarrollo de la economía del dato (BAIDATA). Duration: 01/01/2026 – 31/12/2028 (36 months) Total cost: 3.789.442,45 € Cost…
Projects funded under the INTERREG Madeira–Azores–Canaries (MAC) Territorial Cooperation Programme 2021–2027 FIRST call of the INTERREG MAC Territorial Cooperation Programme, 2021–2027 RENATURMAC project – Revaluation and conservation of protected natural spaces through the improvement of the green and blue transition with linked urban and rural spaces (1/MAC/2/2.7/0084) General Objective: Promote actions for the development and consolidation of a green and blue transition between protected natural spaces and linked urban and rural territories in the cooperation area, fostering sustainability and enhancing their social and tourist link. Partners: Instituto Tecnológico y de Energías Renovables, S.A. (ITER)(main beneficiary), Cabildo Insular de Tenerife…
Capitalisation and Enhancement of the Environmental Monitoring System Adapted for Vulnerable Urban Environments Data Acronym: CAMBIOS Reference: 2/MAC/3/6.1/0215_CAP Partners: Instituto Tecnológico y de Energías Renovables (ITER) – Canary islands (promoter and recipient), Camara Municipal da Praia – Capa Verde (recipient) and Direcção do Ambiente e Acção Climática – São Tomé and Príncipe (recipient). Duration: 16 october 2025 to 16 october 2027 (24 months) Budget: 627.227,30 € Co-Financing: Interreg Cooperation Programme MAC 2021 – 2027 / ERDF.. Piority 3 – MAC Governance – Improving the governance of cooperation in the Madeira-Azores-Canary Islands (MAC) cooperation area. O.E. 6.1 – Improving institutional capacity, promoting…
Design and Installation of an Open Satellite Telecommunications Platform with a Control Center in Tenerife Data Acronym: 24-ES-DIG-SAT-TEL Reference: Proyecto CEF nº 101241298 Partners: Instituto Tecnológico y de Energías Renovables (ITER), S.A. – Coordinator and CANARYSAT Satellite Services S.A. – Beneficiary Duration: 1/12/25 – 30/11/2028 (36 months) Budget: 18.177.211,00 € Co-funding: “Connecting Europe Facility” (CEF) – Digital / European Union (CEF-DIG-2024-GATEWAYS – Works) Project overview The 24-ES-DIG-SAT-TEL project aims to design and install an open satellite telecommunications platform, including a satellite control center located in Tenerife. This infrastructure is conceived as a next-generation teleport, capable of providing ground segment services…
CIDIHUB – Canary Islands Digital Innovation Hub Data Acronym: CIDIHUB Reference: 101083701 Partners: Innovalia Asociación de Empresas Tecnológicas. Instituto Tecnológico de Canarias (ITC). Gobierno de Canarias, Clúster Marítimo de Canarias (CMC), Clúster Canarias Excelencia Tecnológica (CET), Plataforma Oceánica de Canarias (PLOCAN), Avantalia Soluciones, Instituto de Astrofísica de Canarias (IAC), Instituto Tecnológico y de Energías Renovables (ITER), Universidad Fernando Pessoa Canarias, Gestión y Planeamiento Territorial y Medioambiental (GESPLAN), Tech Universidad Tecnológica, and Sociedad Canaria de Fomento Económico (PROEXCA). Duration: November 2022 to October 2025 (36 months) Budget: 2,139,540.02 € Co-Financing: • Digital Europe Programme – DIGITAL-2021-EDIH-01 Programme to Support Digital Innovation…
PRACTICE. Promoting the employability of qualified persons On 06/02/2025 we proceed to the publication of the selection bases in relation to the selection procedure of the candidates sent by the Canary Islands Employment Service (SCE) for the training contract “professional practice”.PRACTICE. Promoting the employability of qualified technical personnel”. 06/02/2025: Bases PRACTICA. Promoting the employability of qualified technical personnel”. 17/02/2025: Explanatory note 02/27/2025: Explanatory note
Projects funded under the Interreg Madeira-Azores-Canarias Territorial Cooperation Program (MAC) 2014-2020. Second call of the INTERREG MAC Territorial Cooperation Program, 2014-2020. MACLAB-PV Project – Improvement of R&D&I capacities and infrastructures in the renewable energy and energy efficiency sector in the Canary Islands and Senegal (MAC2/1.1a/395) General Objective: To promote excellence and applicability of scientific and technological activity in the renewable energy and energy efficiency sector, contributing to the sustainable development of the Canary Islands and Senegal. Partners: Instituto Tecnológico y de Energías Renovables, S.A. (ITER), Agencia Insular de Energía de Tenerife, Fundación Canaria (AIET), Centre d’Etudes et de Recherches sur…
The Wind Tunnel is a facility in which a rectilinear and uniform air flow is obtained at a controlled speed in the test chamber, and which allows the study of the effect of wind on real objects or scale models. For aeronautical uses, this flow must have a quality that is determined by its uniformity and turbulence level. Technical characteristics Closed circuit. Test chamber: 2×2 m2 of section and 3 m long. Maximum operating speed in the chamber: 56 m/s, or 48 m/s in aeronautical configuration. 9 fans of 22 kW each (24m3/s and 500 Pa pressure increase). Aeronautical tests:…
BIOCLIMATIC HOUSES This complex, comprising 24 houses, has been developed in accordance with bioclimatic architecture criteria, in synchrony with the environment and the climate, so as to minimise the impact of the latter and thereby reduce conditioning-related energy needs. In addition, the houses incorporate renewable on a small scale, as required to satisfy the demands of the complex. The 24 houses were selected as the best examples of bioclimatic houses in an international competition promoted by the Tenerife island council and ITER, and endorsed by the International Union of Architects. The dwellings have an average floor area of 110-120m² and…
