{"id":39049,"date":"2015-02-26T14:28:29","date_gmt":"2015-02-26T14:28:29","guid":{"rendered":"https:\/\/\u200bnew.iter.es\/ccg-iter\/"},"modified":"2025-02-26T14:28:29","modified_gmt":"2025-02-26T14:28:29","slug":"ccg-iter","status":"publish","type":"post","link":"https:\/\/www.iter.es\/en\/ccg-iter\/","title":{"rendered":"CCG-ITER"},"content":{"rendered":"<p>In 2011, Red El\u00e9ctrica de Espa\u00f1a (REE) empowered CCG-ITER as a delegated generation office to liaise with the system operator&#8217;s control centers.<\/p>\n<p>According to Royal Decree 413\/2014, all production facilities from renewable energy sources, cogeneration and waste, in electricity systems in non-peninsular territories, with installed power greater than 0.5 MW, and those with installed power less than 0.5 MW but forming part of a group whose total installed power is greater than 0.5 MW, must be attached to a Generation Control Center (CCG) and have Real-Time Telemetry (TTR).<\/p>\n<p>CCG-ITER offers the necessary services so that production facilities from renewable energy sources comply with the provisions of the Royal Decree.<\/p>\n<h3 class=\"fusion-responsive-typography-calculated\" data-fontsize=\"15\" data-lineheight=\"45px\">Provision of services<\/h3>\n<p><strong>Attachment to the Generation Control Center and real-time telemetering service (TTR).<\/strong><\/p>\n<p>It includes the configuration of the communication between the installation and the CCG-ITER servers, the start-up of communications with REE for the TTR and CCG assignment, operational and technical tests, and certification of the CCG assignment.<\/p>\n<p><strong>Adequacy of facilities<\/strong><\/p>\n<p>In the event that the facility does not have the necessary infrastructure to register for the service.<\/p>\n<h3 class=\"fusion-responsive-typography-calculated\" data-fontsize=\"15\" data-lineheight=\"45px\">Benefit claim<\/h3>\n<p>If you wish to contract the services of the CCG-ITER, please contact us through the <strong class=\"green\">REQUEST <\/strong>section and we will guide you step by step through the procedure to follow.<\/p>\n<p><strong>Links of interest:<\/strong><\/p>\n<p><a href=\"mailto:clientes.ccg@iter.es\">Request<\/a><\/p>\n<p><a href=\"https:\/\/www.iter.es\/ccg-iter\/\" target=\"_blank\" rel=\"noopener\">CCG-ITER<\/a><\/p>\n<p><a href=\"https:\/\/www.iter.es\/plantas-fotovoltaicas\/\" target=\"_blank\" rel=\"noopener\">Photovoltaic plants<\/a><\/p>\n<p><a href=\"https:\/\/www.iter.es\/parques-eolicos\/\" target=\"_blank\" rel=\"noopener\">Wind farms<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In 2011, Red El\u00e9ctrica de Espa\u00f1a (REE) empowered CCG-ITER as a delegated generation office to liaise with the system operator&#8217;s control centers. According to Royal Decree 413\/2014, all production facilities from renewable energy sources, cogeneration and waste, in electricity systems in non-peninsular territories, with installed power greater than 0.5 MW, and those with installed power<\/p>\n","protected":false},"author":1,"featured_media":37532,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[210,220,219,224],"tags":[214,216],"class_list":{"0":"post-39049","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-activities","8":"category-renewable-energies-en","9":"category-services","10":"category-technology","11":"tag-renewable-energies-en","12":"tag-technology"},"_links":{"self":[{"href":"https:\/\/www.iter.es\/en\/wp-json\/wp\/v2\/posts\/39049","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iter.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iter.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iter.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iter.es\/en\/wp-json\/wp\/v2\/comments?post=39049"}],"version-history":[{"count":0,"href":"https:\/\/www.iter.es\/en\/wp-json\/wp\/v2\/posts\/39049\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iter.es\/en\/wp-json\/wp\/v2\/media\/37532"}],"wp:attachment":[{"href":"https:\/\/www.iter.es\/en\/wp-json\/wp\/v2\/media?parent=39049"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iter.es\/en\/wp-json\/wp\/v2\/categories?post=39049"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iter.es\/en\/wp-json\/wp\/v2\/tags?post=39049"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}